LH2CRAFT: Task 5.1 – Concept Engineering Design of the HDMSS

The objective of the first task of work package 5 (WP5) is to initiate the development of the conceptual design for the handling, distribution and monitoring subsystems (HDMSS). Part of this task will include the identification and examination of the operation modes, process flow diagram, single line process and instrumentation diagrams (P&IDs), relevant sensors and electrical systems identification. At the final part of this task the port bunkering facilities and existing methods from LNG industry will be examined and correlated with those foreseen for the LH2.